Sai Krupa Enclave Elevation
Typical Floor Plan
Structure | RCC Framed Structure |
Walls | Brick Work with Country Brick with Cement Mortar and Plastering with Sponge Finish. |
Flooring | Standard size of Vitrified Tiles in Hall, Bed Rooms and Kitchen. Antiskid Ceramic Tiles in Wash Area and Balconies. |
Finishing | Internal Wall and Cealing Finished with Wall Putty for Hall, Bedroom and Dinning Hall |
Main Door | Teak Wood Frame and Shutter with Polished Finishing |
Internal Doors | Teak Wood Frame / UPVC with Laminated Flush Doors |
Windows | Teak Wood Frame / UPVC /Quality Aluminum slides / Doors with Safety Grills and Glasses |
Kitchen | Black Granite Platform with Granite sink and 2ft height tiles dadoing over the platform |
Wardrobes | RCC Racks will be provided in Hall, Bed Room, Kitchen & Dinning in 20% of Flat Area. |
Toilets | Flooring with Antiskid Ceramic Tiles & Wall Cladding with Ceramic Tiles Upto Door Level. Commode one Western and one Indian Style. |
WashBasin | In Dining Area and one in Attached Toilet |
Taps | Standard CP fittings |
Electrical | Concealed Copper Wiring with Modular Switches, TV and Telephone Point in living Hall and Master Bed Room only. |
Water Lines | With CPVC and Drainage lines with PVC pipes. |
Painting | Quality emulsion for Internal wall and for External Walls, Enamel Paints for Windows and Grills. |
Elevators | 2 Nos. (8 Passengers lift) with Standard fixtures. |
Generator | For Lift, Water motor, Common area Lights and 2 Fans, 2 CFL Bulbs for each Flat. |
Costs | Extra Charges for Car Parking, Electricty & Water connection Deposits, sewerage, corpus fund, VAT, Service Tax, CESS and all Government fee and taxes etc., Borne by the customer only. |
Route Map
Swimming Pool
Construction Updates
Construction Updates
Construction Updates
Construction Updates
Construction Updates
Construction Updates
604-786-4440 johnathan@gmail.com